Singer Brian candidly revealed the reason for the construction delay of his dream dwellings.
On the 15th, Brian, a prospective dweller, appeared as a guest on the MBC variety show 'Save Me! Holmes.'
On that day, Brian shared updates about the house he is currently building in Pyeongtaek, Gyeonggi Province, saying, "I am waiting for the completion more than anyone else."
The house Brian is building is a large mansion totaling 300 pyeong, with a three-story structure that includes 2 floors above ground and a separate basement space. It has garnered attention as a luxury house with high ceilings and an open structure, as well as an outdoor swimming pool and home gym. He expressed a special affection, saying, "This house is a space filled with all my dreams."
However, the completion of the dream-like house is still postponed. Brian expressed his frustrations, stating, "People around me said, 'Will it be done in 6 months?' which is ridiculous, but there really has been a delay. Last summer, it was the rainy season, and in winter, heavy snowfall forced the construction to halt. Additionally, since the building materials were imported from overseas, it took time for them to arrive."
The original target completion time was in October to November of last year. He revealed, "It has already been delayed by more than 6 months, but it is still ongoing."
Given that Brian was previously known for his passion for organizing walls and interior design, expectations are high for this dream dwellings. There is growing interest in when his completed "dream house" will finally be revealed.
[OSEN]